This is a 2 hour consultation with Gregg Todd, President of GT Design, Inc. and GM Construction, Inc. This is only a consultation, if moving forward with a project, there is no guarantee that GT Design, Inc. or GM Construction, Inc. will be able to do the work. Consultation must be held in Kailua-Kona, HI or virtually.
$530 - 2 bids
Minimum Bid Increment:
$30
Value:
$600
Donated By:
GM Construction, Inc.